Installation & Maintenance

Installation

Prepare the site with:
  • Pressurized sample line 14 to 420 kPA (2 to 60 psi)
  • Free flowing drain
  • AC Power
  • Clean water line (for automated cleaning) 280 to 552 kPa (40 to 80 psi)
Then, ZAPS representatives set up the instrument, which often takes less than an hour.

Maintenance

  • Self maintaining cycles - clean and calibrate
  • 10 minute operator clean once a week to every other week - depending on application (built-in diagnostic tells when this is necessary)
  • Preventative maintenance: once per year
  • Instrument-Installation-285x300

    Adequate site preparation is key for successful LiquID monitoring. ZAPS installation technicians will walk you through the process.